- Home
- Print Farm

Plan your material supply
Filament engineered for print farms
Compare per-kg pricing from a listed 50-spool monthly starting point, qualify samples on your own fleet, and confirm stock and lot requirements before payment.
Why FilamentBay
Built for farms, priced like a factory
Per-kg ladders from $10.99 for PLA. No middleman: you buy from the plant that extrudes it.
Request lot traceability and discuss a reserved batch for repeat colors. Confirm measurable acceptance limits and the actual lot record in writing.
Starting settings, evidence status and controlled test workflows help prepare your own fleet validation. No published multi-printer validation is implied.
Confirm available stock and the dispatch estimate before payment. Pallet freight and preorder dates are quoted separately.
Print-farm ready materials
View all materialsPer-kg pricing by monthly volume. Mix materials and colours freely within a band.
| Volume | PLA Basic | PETG | TPU 95A | PCTG | Terms |
|---|---|---|---|---|---|
| 4+ spools | $14.07 / 1 kg · 1.75 mm | $14.95 / 1 kg · 1.75 mm | $21.99 / 1 kg · 1.75 mm | $21.99 / 1 kg · 1.75 mm | 12% quantity discount; shipping and tax confirmed separately |
| 50+ spools / month | Request current bulk pricing | Destination, quantities and supply terms reviewed with your request | |||
Displayed material prices use the current catalog. Bulk pricing, shipping and payment terms require confirmation.
What filament really costs your farm
Enter your fleet. The estimate uses continuous extrusion during printing hours and our launch price ladder.
Assumes 30 days and continuous extrusion during printing hours. Real usage is 10–25 % lower because of travel moves and idle time.
Method and assumptions: Print farm filament cost guide.
Build a qualification and replenishment record
Before the first production order
- Record grade/color, nozzle, slicer, part orientation and the sample lot.
- Set a practical acceptance check for fit, appearance and performance.
- Confirm which TDS or batch records are available.
- Agree a written quote, shipment plan and handling of rejected material.
Before a repeat order
- Use the accepted specification rather than only a material name.
- Confirm whether the same lot or a new lot is supplied.
- Recheck color and critical dimensions after any lot or process change.
- Order against actual measured consumption and lead time; this calculator is only an estimate.

The plant behind the price
20,000 m², 50+ lines, 1,000 tons a month
These are supplier-reported figures from the company brochure, not an audited stock or capacity guarantee. The evidence register separates company information from grade and batch qualification.
How we testReady to scale your farm?
Tell us your fleet and monthly usage. We reply within one business day with a price sheet and a sample spool offer.
Not at 50 spools yet? Build an order request: 4+ spools take 12% off automatically.